Bellingham Marine Bellingham Marine
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Erosion Control Modules
      • Dolosse
    • Precast Products
  • Services
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In
Close
  • Home
  • Products
    • Floating Docks
      • Concrete
        • Unifloat
        • Unibolt
      • Wood Docks
        • Unideck Timber
        • Portable Wood
      • Aluminum
    • Wave Attenuators
    • Floating Platforms
      • Landing Platforms
      • Portable Platforms
      • Floating Structures
    • Drystack
    • Shoreline Protection
      • Erosion Control Modules
      • Dolosse
    • Precast Products
  • Services
    • Design/Build
    • Pre-Construction
    • General Contracting
    • After-Market Care
    • Product Supply
  • About
    • Overview
    • History
    • Our Clients
  • Projects
  • Press
    • Press Releases
    • Articles
  • Blog
  • Careers
    • Life at Bellingham Marine
    • Apply for a Job
  • Contact
  • Log In

Press Releases

MEMBERS OF JAMES ISLAND YACHT CLUB CELEBRATE THE OPENING OF THEIR NEW FACILITY

April 23, 2012

James Island Yacht Club marked the grand opening of its new dock, located at the end of Wampler Drive in Charleston Harbor, on James Island, SC, with a ribbon-cutting ceremony on Saturday, March 10th. The Club’s Commodore, Mike Spivey, as well as many of the club’s members, and professionals who worked on the project were present for the ceremony. The new dock replaces the club’s former launching facilities located at the same site.

The club’s existing fixed pier and small launch float were replaced with a new fixed pier and 400’ of concrete floating docks from Bellingham Marine. “The [new] dock was constructed with great care and sacrifice by a dedicated group of yacht club members who served unselfishly to ensure its success,” remarked Spivey.

Situated at the end of the new fixed pier is a 240’ Unifloat dock for short term moorage and running parallel to the pier is a 160’ Unifloat launch dock. Two new gangways provide pedestrian access to the floating docks from the pier and a hoist helps move boats in and out of the water.

“The new facilities have had a positive impact on the club as well as the community,” said David B. Hazeltine, lead architect on the project for Cusick Hazeltine Architects, LLC. “Without Bellingham Marine’s involvement, the project would not have been supported by the club. The company’s extra efforts and dedication to the process of working through the design and pricing made all the difference and made it a pleasure to work through the details.” James Island Yacht Club was established over 100 years ago to promote sailing among its members and the community. The club has an active membership base and is best known for their sailing programs, community events and most notably for the Special Olympics Regatta.

As the world’s leading marina design-build construction company, Bellingham Marine produces Unifloat® concrete floating dock systems as well as timber and metal frame systems. The company also produces Unistack® dry stack systems for marinas worldwide.

Contact: Bellingham Marine, P.O. Box 8, Bellingham, WA 98227; www.bellingham-marine.com.

Unifloat, Unideck and Unistack are registered trademarks of Bellingham Marine.

Posted in: Press Releases Author: leilanifera
Download Word Doc Download PDF

Share

FacebookTwitterGoogle +Pinterest

Leave a Reply / Cancel Reply

Explore Blog

Subscribe to our Mailing List

  • This field is for validation purposes and should be left unchanged.

Recent Posts

  • Ayia Nappa Opens for Boats
  • Joe Ueberroth Discusses Marina Development and Industry Trends
  • Spotlight on Best Marina Rebuilds
  • Trinity Point Delivers on Promise to Build World-Class Marina on Iconic Waterfront Development
  • Bellingham Marine President & CEO Everett Babbitt Will Retire at End of 2019
  • Back to Blog
  • Prev
  • Next

© 2018. Bellingham Marine Industries. All Rights Reserved. PRIVACY POLICY

Submit your question

We use cookies to ensure that we give you the best experience on our website. By clicking on or navigating the site, you agree to allow us to collect information through cookies. Please read our Privacy Policy for more information.X